So, a lack of updating shows that we are clearly not doing a damn thing on the flat. Which is a shame because there is still a lot that needs doing. SO I am making a bold statement here, but I think I would like to be finished by the end of the year. Our fixed rate mortgage comes to an end, and we'll be on a lower interest rate from January, so if we finish it, then we are free to either sell it and move on, or rent it out on the lower interest rates, or stay and enjoy it. Either way, it has to move on.
So, today I have had someone round to give us a quote on doing up the floorboards. The price was pretty reasonable, so I think I'm going to get him in. I have hired a friend's cousin to come round and finish off all the sanding and painting of skirting boards and the last bits of painting on the walls, and once that's done, I can get someone in to do the carpet in the hallway. There is then work to be done in the kitchen and bathroom, but although we had grand plans for amazing shower units and a new kitchen, realistically I think for now we will keep this work to a minimum.
There. I have posted it. If, in three months time, I post again and say that we still haven't done anything, then that will be very sad, but not that unlikely. SO much work, so little time, and so little motivation!
Showing posts with label 2009. Show all posts
Showing posts with label 2009. Show all posts
Saturday, 3 October 2009
Sunday, 28 June 2009
I see you!
A couple of weeks ago I bought a big mirror from the salvage yard in Vauxhall. It was reclaimed from Selfridges when they did the place up a while back, and while it was lovely and large and (fairly) cheap, the colours are pretty garish. SO today I had some fun painting it black. It needs one more coat, but looks pretty good already! If only the boyfriend would allow me to operate a drill, I could put it up on the wall this week...

Labels:
2009,
decoration,
flat,
june,
painting,
renovation
Sunday, 8 March 2009
Painting
The living room and hallway are so close to being finished I can taste it. In the living room, just a stubborn blue patch remains. We discovered a whole load more wallpaper that needed to come off before we could start on the final part, but now we are so almost there. In the hallway, the undercoat is finished, and we just have around 1/2 of the overcoat remaining. Next weekend we might actually be able to move on to the bedroom, which we painted when we first moved, but in a shade of white that we are no longer happy with.
Before:
After:
Before:
Labels:
2009,
decoration,
diy,
flat,
london,
march,
painting,
project,
renovation
Saturday, 7 March 2009
Organising
I've spent quite a number of hours this morning on the Real Simple website and Lakeland. I am now £50 poorer and determined to get more organised. I'm getting a shelf to lift my cookbooks onto and a plate shelf so that I can stop almost breaking things whenever I try to get plates down. Also on the list: tongs, a moisture remover for the bathroom, a handheld shredder, a sink tidy, and a plastic bag dispenser, as the IKEA thing isn't working out so well.
But for today, I started simply by sorting through some plastic tubs and am now trying to get rid of a whole load more things on Freecycle. I'm getting rid of:
3x trainers
1x boots
1x wellies
2x shot glasses
3x wooden bowls
1x beach towel
1x large plastic tub
I also have one huge CD wallet full of CDs and a smaller wallet half full, but I think I'll try to sell that on Ebay, since the wallets on their own go for a tenner. I have some other Ebayable items, so I might have to get on that next.
But first! I finally hung up the hook that "Santa" got me from India. Yay! It looks great. I did try to hang a second hook in the kitchen, but I was up on a ladder, and I have no drill and I dropped the screw and it all went a bit wrong. So that might have to wait for another day...
But for today, I started simply by sorting through some plastic tubs and am now trying to get rid of a whole load more things on Freecycle. I'm getting rid of:
3x trainers
1x boots
1x wellies
2x shot glasses
3x wooden bowls
1x beach towel
1x large plastic tub
I also have one huge CD wallet full of CDs and a smaller wallet half full, but I think I'll try to sell that on Ebay, since the wallets on their own go for a tenner. I have some other Ebayable items, so I might have to get on that next.
But first! I finally hung up the hook that "Santa" got me from India. Yay! It looks great. I did try to hang a second hook in the kitchen, but I was up on a ladder, and I have no drill and I dropped the screw and it all went a bit wrong. So that might have to wait for another day...
Tuesday, 17 February 2009
Shower: The update
I had a hot shower this morning. As lovely as the bucket bath is, nothing beats a warm shower first thing in the day...
Monday, 16 February 2009
Triton t80si pumped
So, last weekend, our shower died. Well, we think it died. We couldn't see anything too wrong with it, but there was no more hot water. Rather than spend £50 on a plumber and £100 on parts, we just decided fek it. Our shower is mank - who knows how many years it was in the bathroom before we moved in. So we decided to buy a new one.
And because apparently only a very small number of shower models do both the heating and the pumping of water, we were fairly limited in our selection. And because we are scared of drilling, we opted for the easiest choice: a brand new version of exactly the same shower. Genius.
The boyfriend ordered the shower from Plumbworld, and didn't want to open the box at work in case all sorts of miscellaneous bits spilled out. "But I'm not really sure how I'm going to get it home," he said this evening when he rang after work, "because it's almost as big as me." He did manage to navigate it home on the buses, and this is what we found inside:

The weight was split 50/50 between shower and shredded cardboard packaging. I guess Plumbworld are reeeeally worried about damage in the post.
Anyway, we read the instructions, we tested the old shower *just* to make sure that we weren't just being silly, and then we took the old one down and put the new one up. The holes were in the same place on the wall, we'd already taken one apart, so we knew how to put the new one together. It was super easy.

Too easy. As of tonight, the shower is working and is lovely and hot, but will it last!? I don't want to count my chickens just yet. It all seems to good to be true... only tomorrow's shower will tell...
And because apparently only a very small number of shower models do both the heating and the pumping of water, we were fairly limited in our selection. And because we are scared of drilling, we opted for the easiest choice: a brand new version of exactly the same shower. Genius.
The boyfriend ordered the shower from Plumbworld, and didn't want to open the box at work in case all sorts of miscellaneous bits spilled out. "But I'm not really sure how I'm going to get it home," he said this evening when he rang after work, "because it's almost as big as me." He did manage to navigate it home on the buses, and this is what we found inside:
The weight was split 50/50 between shower and shredded cardboard packaging. I guess Plumbworld are reeeeally worried about damage in the post.
Anyway, we read the instructions, we tested the old shower *just* to make sure that we weren't just being silly, and then we took the old one down and put the new one up. The holes were in the same place on the wall, we'd already taken one apart, so we knew how to put the new one together. It was super easy.
Too easy. As of tonight, the shower is working and is lovely and hot, but will it last!? I don't want to count my chickens just yet. It all seems to good to be true... only tomorrow's shower will tell...
Subscribe to:
Posts (Atom)